NOMENA
FAQBook a meeting

Nomena / Guides / Manufacturing quote template

Manufacturing quote template

A quote from a machine shop or fabricator should include what is being quoted (part, drawing number and revision), the price per quantity, lead time, delivery and payment terms, validity and assumptions for anything that was unclear. With Nomena all of it is filled in automatically, with your own terms.

What the quote should include

  • The customer and your reference.
  • The partName, drawing number and revision.
  • Price per quantityFor example 10, 50 and 100 pieces, plus any one-off costs for tooling and fixtures.
  • Material and surface treatment as you have interpreted the drawing.
  • Lead time from order or from approved drawing.
  • TermsDelivery terms, payment terms and validity.
  • AssumptionsWhatever was unclear on the drawing, and what the price is based on.

Quote or estimate?

An estimate is an approximate price. A quote is a binding offer for as long as it is valid. Say clearly which one it is.

How Nomena does it

From email to finished quote.

The whole flow is automated, from the moment the email comes in until the quote is ready. Nomena reads the customer's email, drawing and 3D file, calculates the price with your shop's own hourly rates and writes the draft quote by itself. You open a finished draft, change what you want and send it. The price is calculated by code, never by AI, and no quote goes out without your approval.

1The email comes inA request with drawing and 3D file
2ReadMaterial, dimensions, tolerances and holes
3CalculatedBy code, with your rates and machines
4You reviewEvery line is visible, change what you want
5The quote is sentIn your template, from your own address

Frequently asked questions

Questions and answers.

How long should a quote be valid?

30 days is common, shorter if material prices move a lot. Nomena uses your own validity period.

Is there a quote template for machine shops?

Nomena has the template built in, with your terms, your logo and prices for several quantities. The quote can be downloaded as a PDF.

Free during the pilot

Try it on your own jobs first.

We run some of your past requests and put the drafts next to your real quotes.

Book a meeting